Industrial Engineering / Operations Consulting __
Process Designer / Process Simulate
Overview
With Siemens Tecnomatix Process Designer and Process Simulate, PMC leverages current and historical data to integrate with advanced, best-in-class engineering softwares. This allows knowledge workers more time in the early stages of process development and process verification to make value-added decisions, ultimately maximizing program success.
Hierarchical database tools
Process Designer and Process Simulate (PDPS) are hierarchical database tools that link OEM product with Bill of Process (BOP) information and Bill of Equipment (BOE) information in order to create a digital twin of your manufacturing environment. Together, they comprise a ‘single source of truth’ where all process information can be correlated, interrelated and controlled. Siemens Tecnomatix Process Designer and Process Simulate have been in production since 2004, and they are proven, field-tested software that bring value to your company’s supply and value chains.
Benefits of adopting Process Designer and Process Simulate include the capability to
- Improve manufacturing engineering productivity.
- Increase process quality, commonality and consistency.
- Reduce cost of change with early detection and communication of product design issues.
- Reduce number of physical prototypes with upfront virtual validation.
- Generate and communicate 3D workspace visualizations.
- Advance the application of Industry 4.0.
GALLERY
Additional Information
- Case Study: Capacity Analysis Aids a Vehicle Processing Facility
Contact Us
Please write your questions in the following form and we will get to you as soon as we possible. We would love to work together!
Get to know more of our services
Program Management
PMC offers services beginning with base evaluation to ‘scope of work’ creation through full program implementation.
Scheduling
Scheduling is advance planning of the time, location, order and resources required to complete an operation or work. Scheduling helps in affirming and maintaining any improvement efforts as well as running the system efficiently.
Time study and work management
A number of Industrial Engineering methodologies fall under the umbrella of Work Measurement. These include MODAPTS, Time Study, and Predetermined Motion Time System (PMTS).