Monday, September 23, 2019

PMC Home

Steel Assembly Simulation Project

Discrete Event Simulation

The client for this project is a multinational conglomerate that focuses on industrial engineering and steel production. PMC offered a discrete-event simulation model to evaluate the design of a new production line and to validate the throughput capacity that the client envisioned. Our utilization of discrete-event simulation techniques allowed the client to test different layout and process configurations in the design phase of their project before committing to a large capital investment. 

Please refer to our case study for additional information.

Steel Assembly Simulation

 

PMC Quick Contact     Expand >

Maximize

Customer Feedback

“Your engineering team provided a well organized effort in capturing difficult parameters within a hospital environment.  By constructing a graphic model, we were able to visualize patient traffic, and determine several operational conditions.” 
Global EPCM firm Business Leader, Health Care Studio

“This is just a quick letter to let you know how personally pleased I am with the results of our recent project.  [PMC engineer] provided us with a first rate model that was an important part of [our company] receiving a large Purchase Order from [a major automotive OEM] to build the project that had been modeled.”
World-wide supplier of Assembly and Test Equipment, Proposal Manager

Home             About                                        Contact             Sitemap
Copyright © 2004-2019 Production Modeling Corp.