Monday, December 05, 2016

PMC Home

Case Studies

DescriptionIndustryCategoryDocument
Industrial Engineering Studies Reveal $4M SavingsAutomotiveWork MeasurementCase Study 0189-Automaker A.pdf
Supply Chain Optimization Improves Service LevelsAutomotiveSimulation, OptimizationCase Study 0126-Automaker B.pdf
Hospital Capacity Analysis Helps Validate Architect's Master PlanHealthcareSimulation, Capacity AnalysisCase Study 0213-Hospital Master Plan Validation.pdf
Capacity Analysis Enables Right-sizing InitiativesAerospace & DefenseSimulation Modeling, SchedulingCase Study 0215-Capacity Analysis.pdf
Lean and Six Sigma Lead to Process ImprovementHealthcareWork Measurement, Lean and Six Sigma, Theory of ConstraintsCase Study 0209-Hospital B.pdf
Aircraft Assembly Productivity ImprovementAerospace & DefenseSimulationCase Study 0216-Aerospace.pdf
Lean & Six Sigma Improves Construction ProcessAECLean and six sigma, work measurementCase Study 0223-Refinery.pdf
Simulation and TOC Validates Steel Mill CapacityIndustrial ManufacturingSimulation, Theory of Constraints, Manufacturing ProductivityCase Study 0217-Steel.pdf
Material Handling Study Saves Over $900KIndustrial ManufacturingSimulation, Theory of Constraints, Material HandlingCase Study 0151-Foundry Material Handling.pdf
PLM Assessments Help Define RoadmapIndustrial ManufacturingEngineering Productivity, PLM, Digital EngineeringCase Study 0218-Engineered Products Company.pdf
Home             About                                        Contact             Sitemap
Copyright © 2004-2016 Production Modeling Corp.